and extracts the following text as a script body — the dev server then fails its dependency scan with `Expected ";" but found "non"` from the words "non-allowlisted hosts", which breaks e2e. So, what this buys, so nobody reads more or less into it: blocks external `script src=` from non-allowlisted hosts blocks injected inline scripts — each one is pinned by hash blocks fetch/XHR/WebSocket exfiltration (connect-src allowlist) blocks form-action, base-uri, object-src vectors does not stop image-based exfiltration — img-src must allow https: because event media comes from arbitrary publishers' og:image The cost of hashing is that an inline script edited after the hashes are computed is silently refused by the browser. That is why the violation reporter below exists: report-uri/report-to are ignored in a meta element and Pages serves no CSP header, so violations are caught in-page and sent to PostHog instead (src/lib/csp-report.ts, #241). frame-ancestors is deliberately NOT in this string: it is ignored in a meta element and browsers log a warning about it on every page load. It lives in public/_headers instead, ready for a CDN in front of Pages. X-Frame-Options (set there too) is the clickjacking control that actually applies today. */ }
record high confidence

Germany Surpasses 128 GWp Solar Capacity, Hitting 2026 Target Ahead of Schedule

| Climate Solutions

Germany's nationwide installed photovoltaic capacity passed 128 gigawatts-peak (GWp) in August 2026, fulfilling the statutory 2026 expansion target set under the Renewable Energy Act (EEG) ahead of schedule, according to an analysis by the German Solar Association (BSW-Solar) based on Bundesnetzagentur market master data, announced August 20. More than 6 million solar installations are now operating in Germany; solar supplied around one-fifth of the country's net electricity generation in 2025. BSW-Solar warned that hitting the next EEG milestones -- 172 GWp by 2028 and 215 GWp by 2030 -- will require sustaining roughly 20 GWp of annual additions, above the ~17.5 GWp installed in each of the past two years.

Rooftop solar installation in Germany -- national capacity passed 128 GWp in August 2026
Rooftop solar installation in Germany -- national capacity passed 128 GWp in August 2026 — Solarserver